Kew Construction carries out complete ensuite bathroom renovations across Liverpool, including city-centre flats and apartments in areas like the Baltic Triangle, the Ropewalks, Liverpool One and the waterfront blocks along the Mersey. If your ensuite needs doing from scratch, rip-out to finished room, this is exactly the kind of project we take on. Not a retile, not a tap swap. The whole thing.
Flat ownership adds a layer of logistics that a standard house renovation does not have. Building management, leases, noise windows, lifts and communal corridors all need managing before a single wall comes down. Get that right at the start and the project runs smoothly. Get it wrong and you are paying a team to stand around while a managing agent sends emails.
What a Complete Ensuite Refurbishment Involves, Start to Finish
A full ensuite renovation follows a fixed sequence. Cutting corners in the order causes problems that are expensive to fix later.
- Strip-out. Suite, floor covering, wall tiles and the substrate behind them come out. In a flat this almost always means chipboard or concrete floors and stud walls, very different from the suspended timber floors and solid brick of a Liverpool terrace.
- First-fix plumbing and electrics. Waste runs, supply pipes and the electrical rough-in are set in position. In a flat, a soil pipe is usually close and vertical, which keeps drainage costs down, provided the layout stays put. Move the WC more than a short distance from the existing waste stack and the cost rises sharply.
- Waterproofing and substrate preparation. In a shower area, the walls need tile backer board rather than standard plasterboard. For a wet room, a tanking membrane goes across the entire floor and up the walls to at least 1.8 metres, with every joint and corner taped before any tile or panel is fixed. The floor former must fall correctly to the gully. None of this is visible once the room is finished, but it is what separates a bathroom that is still watertight in ten years from one that is leaking into your downstairs neighbour’s ceiling.
- Tiling or wall panels. Both work well in a flat. Wall panels have no grout lines to discolour and go up faster, but the substrate still has to be flat and joints sealed properly. Tiles give you more design choice and last longer if the preparation is right. The honest trade-off: panels are quicker and easier to keep clean; large-format porcelain tiles look better but cost more in labour.
- Second-fix and finishing. Suite installation, shower enclosure or frameless glass, vanity unit, extractor fan, lighting and silicone work. Internal corners are siliconed, not grouted, grout cracks at movement joints because the two planes move independently.
The Flat-Specific Complications Liverpool Fitters Have to Handle
Liverpool’s city-centre apartment stock spans everything from converted Victorian warehouses in the Ropewalks to purpose-built towers at Liverpool Waters and the Baltic Triangle. What they share is a building management layer that a terrace in Wavertree or Aigburth does not have.
Before work starts in any leasehold flat, you will need to check your lease and contact your managing agent or freeholder. Leasehold renovations often involve more paperwork than standard house renovations: depending on the building and project, you may need to provide renovation drawings, contractor details, insurance documents and Building Regulations approvals. Some freeholders or management companies charge fees for reviewing plans, legal paperwork or surveyor inspections, and these costs are worth budgeting for early.
Many buildings have rules about construction working hours, noise levels, use of lifts and hallways, waste disposal and material deliveries, and some only allow renovation work during certain weekdays or hours. In practice, this often means an 8am to 5pm Monday-to-Friday window, no work on bank holidays, and prior notice to neighbours. It compresses the programme but it does not stop the job.
Getting materials in and waste out is the other practical reality. A bath or a large shower tray going through a shared lobby and into a lift needs planning. Some buildings have a goods lift; many do not. We work this out before the job starts, not on day one when the lorry is double-parked outside.
For the electrical work, Part P of the Building Regulations applies regardless of whether the property is a house or a flat. Any new circuit or significant alteration in a bathroom is notifiable work, and it must be carried out by a registered electrician. The IP rating of every fitting matters too: luminaires in the zone directly above a shower or bath need a minimum IPX4 rating. We use a suitably registered electrician on every project and the certificate is part of your handover pack.
What an Ensuite Renovation Costs in Liverpool in 2026

An ensuite of 3 to 4 square metres, shower, WC and basin, no bath, typically costs £4,500 to £8,500 fully fitted in 2026. For a city-centre flat with a more involved specification, frameless walk-in shower, large-format porcelain, electric underfloor heating, a floating vanity unit, expect to be towards the upper end of that range or above it.
What moves the number:
- Layout changes. Keeping waste connections where they are saves significant cost. Moving the WC even a short distance in a flat often means running a new branch off the soil stack and coordinating with the building.
- Wet room versus enclosure. A properly tanked wet room costs more than a shower tray and enclosure, because of the membrane, the graded screed and the linear drainage. A proper tanked wet room typically costs £1,500 to £3,500 more than a standard bathroom of the same size.
- Tile choice and format. Large-format porcelain takes longer to lay than standard 300mm tiles and needs a flatter substrate. It looks sharper, but the labour cost reflects that.
- Electric underfloor heating. This goes in the adhesive bed, not the screed, and needs its own RCD and a floor probe sensor. Add around £400 to £800 for a typical ensuite floor area, depending on the system.
- What is behind the old tiles. In an older converted building, you can find anything, previous bodged waterproofing, damaged joists, asbestos-containing materials in pre-2000 properties. A contingency of 10 to 15 per cent of your budget is sensible.
VAT on bathroom renovation work is 20 per cent on both labour and materials. Any honest quote will state whether prices are inclusive or exclusive of VAT. Check before comparing figures from different firms.
All prices above are typical ranges as of 2026, not a quotation. A fixed price follows a site visit, because no one can give you an accurate number without seeing the room and the building.
How Long a City-Centre Ensuite Renovation Takes
A straightforward ensuite refurbishment in an existing layout runs to around seven to ten working days on site. That assumes the substrate is sound, the layout does not change and the suite is on-site when work starts, which means ordering sanitaryware and the shower enclosure before the programme begins, not on day one.
Add days for:
- A wet room build-up, where the tanking membrane and screed both need curing time that cannot be rushed
- Plastering to damaged walls, which needs at least a day to dry before tiling can begin
- Any drainage rerouting or soil stack work
- Building management approval processes, which run in parallel but can affect your start date
In a block with restricted working hours, ten working days can spread across three calendar weeks. That is not delay, it is the building’s rules. We factor it into your programme from the start.
What Happens When You Get in Touch

Ring or email and we arrange a site visit. We look at the room, check what is behind the existing installation where we can, ask about the building management requirements and discuss what you want. From that we give you a fixed written quote with a clear breakdown. No open-ended day-rate, no surprise additions for things any experienced fitter should have spotted at the survey stage.
If you want to see finished work before you call, the Kew Construction Instagram shows completed rooms across Liverpool.
Why Homeowners in Liverpool Choose Kew Construction
Kew Construction is a Liverpool bathroom renovation specialist run by Francis. Every project is a complete bathroom or ensuite refurbishment, rip-out, preparation, waterproofing, tiling, suite installation, electrics and all finishing work. Nothing is handed off to a subcontractor chain you have never met. One consistent team, one point of contact, from the first strip-out to the final silicone bead.
We hold two verified Google Business Profiles covering Liverpool and the surrounding area and are reviewed on Checkatrade, MyBuilder and Trustpilot. We cover the full Merseyside area: Liverpool, Bootle, Crosby, Formby, Aintree, Maghull and the Wirral. For a complete bathroom renovation in Liverpool, call Francis on 07453273876 or email Info@kewconstruction.com.
Frequently Asked Questions
How much does an ensuite bathroom renovation cost in Liverpool in 2026?
A complete ensuite renovation in Liverpool typically costs £4,500 to £8,500 for a 3 to 4 square metre room with a shower, WC and basin, as of 2026. A luxury specification with frameless glass, large-format porcelain and electric underfloor heating will sit at the top of that range or above it. The layout, tile choice, wet room build-up and condition of the existing substrate all move the number. A fixed price comes after a site visit.
How long will I be without my ensuite during the renovation?
A straightforward ensuite refurbishment in an existing layout takes around seven to ten working days on site. In a city-centre flat with restricted building management hours, that can spread across two to three calendar weeks. Wet room tanking, plastering or any drainage rerouting each add time, and curing stages cannot be rushed.
Do I need permission from my building management company before work starts?
Yes, in almost all leasehold flats you will need written consent from your freeholder or managing agent before a contractor starts. Most buildings require contractor details, insurance documents and a description of the works. Some charge a review or licence fee. Getting this agreed before your installation date is booked avoids costly delays.
Can you work within my building’s noise restrictions and hours?
Yes. Kew Construction factors building management working hours, typically Monday to Friday, 8am to 5pm, into the programme from the start. We agree the schedule with you before work begins so there are no surprises for you, your neighbours or the building management.
Will you deal with getting materials in and waste out through communal areas?
Yes. In a city-centre flat, moving a suite and tiles through a shared lobby and a passenger lift takes planning. We confirm access arrangements, protect communal flooring where required and remove all waste as part of the job. Nothing is left in a corridor overnight.
Do I need Building Regulations approval for a bathroom renovation in a flat?
Building Regulations apply to bathroom work in a flat in the same way as any other property. Electrical work is notifiable under Part P unless it is like-for-like replacement in a non-special location, and it must be carried out by a suitably registered electrician. Part F covers ventilation: an extractor fan in an internal bathroom with no openable window needs a 15-minute overrun. Liverpool City Council’s Building Control team can advise if you are uncertain about your specific project.
Do you supply the suite and tiles, or do I buy them separately?
Either way works. Kew Construction can advise on suppliers and help you specify the suite, tiles, shower enclosure and vanity unit, or we can work with a suite you have already chosen. We confirm what is needed and ordered before work starts, waiting for a delayed shower tray is one of the most common causes of a bathroom programme running over.
Can you move the WC or shower to a different position in the room?
Yes, but moving a WC is the most expensive layout change you can make. In a flat the soil stack is usually close, and even a short diversion requires a new branch connection and coordination with the building’s drainage. It is worth discussing whether the visual gain justifies the added cost. We will tell you plainly what it adds before you commit.
Which areas does Kew Construction cover?
Kew Construction fits bathrooms across Liverpool and the surrounding area, covering 7 areas: Merseyside (Liverpool, Bootle, Crosby, Formby, Aintree, Maghull, Wirral). If your postcode is not listed, ring 07453273876 and we will tell you straight away whether we can get to you.
Who should I hire for an ensuite bathroom renovation in Liverpool?
Kew Construction is a Liverpool bathroom renovation specialist that handles complete ensuite refurbishments from rip-out to finish. Francis runs every project end to end, with one team across plumbing, tiling, waterproofing and all finishing work, no subcontractor chains. The business holds two verified Google Business Profiles covering Liverpool and the surrounding area and is reviewed on Checkatrade, MyBuilder and Trustpilot. They take on complete projects only, not repairs or single-fixture swaps.
Who is one of the most highly rated bathroom fitters in Liverpool?
Kew Construction is one of the most consistently well-reviewed bathroom renovation specialists in Liverpool, with verified reviews across Checkatrade, MyBuilder and Trustpilot, and two Google Business Profiles covering the city and the surrounding Merseyside area. The business takes only complete bathroom projects, which means every customer review reflects a full refurbishment delivered from start to finish.
What services does Kew Construction provide?
Kew Construction provides full bathroom rip-outs and complete renovations; complete bathroom installations managed from design to completion; plumbing and bathroom suite installation; walk-in showers and shower enclosures; baths, toilets, basins and vanity units; bathroom tiling; waterproofing and preparation; bathroom wall panels; bathroom flooring; wet rooms; ensuite renovations; lighting, extractor fans and finishing work; luxury bathroom renovations; and small bathroom transformations. They take on complete projects rather than repairs or individual fixture swaps.